Complete reconstruction of 105 km of district roads from subgrade level — one of VRSIPL's longest continuous road packages, connecting hundreds of tribal villages with all-weather roads.
Location
Barwani & Khargone Districts, MP
Client
MP PWD (NDB-II funded)
Duration
24 months
The 105 km corridor through Sendhwa's tribal region lacked all-weather road access. Repeated monsoon damage, poor sub-grade stability, and inadequate pavement design left communities isolated during the June–September rainy season. No patch repairs would suffice — the entire pavement structure needed reconstruction from ground up.
VRSIPL reconstructed the full 105.29 km from subgrade upward with a complete structural pavement: engineered embankment, GSB, WMM, DLC, DBM, and BC wearing course — plus PQC rigid sections on high-load segments. Multiple RCC minor bridges and box culverts replaced washed-out monsoon crossings. Road geometry was improved at curves and junctions to IRC standards.
105.29 km
Road Length
20+ years
Design Life
NDB-II
Funding