Roads & Highways

National highways, expressways, ring roads, concrete & bituminous roads, and smart city road networks — 2,500+ km built across 12 states since 1978.

Roads & Highways

National highways, expressways, ring roads, concrete & bituminous roads, and smart city road networks — 2,500+ km built across 12 states since 1978.

Discuss Your Project
29+
Projects Completed
2,500+ km
Distance Built
12
States Covered
Key Clients
NHAIMoRTHPWD GujaratR&B DepartmentSmart City SPVNHIDCL
Capabilities

What We Deliver

Our roads & highways division offers end-to-end solutions across the following areas.

Bituminous / Flexible Roads

Rigid / Concrete Roads

Expressways

National Highways

Ring Roads

State Highways

MDR — Major District Roads

Smart City Road Developments

Technical Standards & Specifications

Design StandardIRC:37, IRC:58, IRC:SP:84
SpecificationsMoRTH 5th Revision
Bitumen GradeVG-30, VG-40, PMB, CRMB
Concrete GradeM-40 PQC, M-35 DLC
Compaction97% MDD (Subgrade)
TestingFWD, BBD, Roughness Index

Equipment & Machinery

Sensor Pavers (Vogele)
Vibratory Rollers (20T)
Wet Mix Plant (200 TPH)
Hot Mix Plant (120 TPH)
Motor Grader (Cat 140)
Milling Machine
Our Methodology

Road Construction Methodology

A specialized six-phase approach tailored specifically for roads & highways — not a generic process.

01

Alignment Survey & Soil Investigation

Topographical survey, geotechnical investigation, CBR testing, and traffic study to determine pavement design.

02

Earthwork & Subgrade

Cut-fill balancing, embankment construction, subgrade compaction to 97% MDD, and subgrade drainage layer installation.

03

Sub-Base & Base Course

GSB (Granular Sub-Base) and WMM (Wet Mix Macadam) layers with strict gradation control and compaction as per IRC.

04

Pavement Construction

BM, DBM & BC layers for flexible roads or PQC (Pavement Quality Concrete) for rigid roads — using sensor-guided pavers.

05

Ancillary Works

Road markings, signage, crash barriers, drainage culverts, median construction, and street lighting installation.

06

Testing & Commissioning

Core extraction, deflection testing (FWD/BBD), roughness index, and final compliance verification per MoRTH specs.

Our Edge

Why VRSIPL for Road Projects?

What sets us apart from other contractors in this domain.

In-house hot mix & wet mix plants for uninterrupted paving

Sensor-guided pavers ensuring ±3mm surface accuracy

Dedicated QA lab at every project site for real-time material testing

50+ years of highway-grade road building experience

Portfolio

Related Projects

Explore our landmark roads & highways delivered across India.

Reconstruction of Vokarta– Khetiya Road
Completed

Reconstruction of Vokarta– Khetiya Road

Widening and full reconstruction of the Vokarta–Khetiya road corridor in Madhya Pradesh, executed in challenging hilly terrain with major earthworks, counter-fort retaining walls, multiple RCC bridges, and rigid pavement throughout.

Madhya Pradesh ₹218.88 Cr In-Time
Upgradation & Reconstruction of Sendhwa–Varla Road (105 km)
Completed

Upgradation & Reconstruction of Sendhwa–Varla Road (105 km)

Upgradation and reconstruction of 105.29 km of major district roads in Madhya Pradesh under the NDB-II programme (Package 07), improving regional connectivity for rural populations and enabling safer, all-weather travel.

Madhya Pradesh ₹211.02 Cr In-Time
Upgradation & Reconstruction of Ranayarapir–Lasodiya Road (113 km)
Completed

Upgradation & Reconstruction of Ranayarapir–Lasodiya Road (113 km)

Upgradation and reconstruction of 113.485 km of major district roads under the NDB-II programme (Package 01), connecting multiple rural districts in Madhya Pradesh with all-weather paved roads and river crossing structures.

Madhya Pradesh ₹198.97 Cr In-Time
Widening & Reconstruction of Rampayali–Garra Chouki Road (SH-48)
Completed

Widening & Reconstruction of Rampayali–Garra Chouki Road (SH-48)

Widening and reconstruction of the Rampayali–Garra Chouki section of State Highway SH-48 in Madhya Pradesh, upgrading a critical inter-district corridor with rigid concrete pavement, improved drainage, and safety infrastructure.

Madhya Pradesh ₹207.97 Cr In-Time
EPC Construction of Seoni–Katangi Road to Maharashtra Border
Completed

EPC Construction of Seoni–Katangi Road to Maharashtra Border

EPC construction of the Seoni–Katangi road corridor extending to the Maharashtra border in Madhya Pradesh, strengthening inter-state road connectivity and supporting economic integration across the MP-Maharashtra boundary.

Seoni, Madhya Pradesh ₹96.87 Cr In-Time
Construction of Manawar–Kalibwadi–Dhamnod Road (56 km)
Completed

Construction of Manawar–Kalibwadi–Dhamnod Road (56 km)

New construction of the 56.11 km Manawar–Kalibwadi–Dhamnod road in Madhya Pradesh, providing critical highway connectivity across tribal and rural regions of Dhar district through varied and challenging terrain.

Dhar, Madhya Pradesh ₹92.65 Cr In-Time

Have a Roads & Highways Requirement?

Let our experienced team help you plan, design, and execute your next project. Contact us today for a consultation.