Loading…
Loading…
Bullet train corridor, metro rail viaducts, elevated stations, and high-speed rail infrastructure — contributing to India's fastest rail projects.
Bullet train corridor, metro rail viaducts, elevated stations, and high-speed rail infrastructure — contributing to India's fastest rail projects.
Discuss Your ProjectOur high-speed rail & metro division offers end-to-end solutions across the following areas.
A specialized six-phase approach tailored specifically for high-speed rail & metro — not a generic process.
GPS-guided alignment survey, bored pile foundation (1.2-2.0m dia) with sonic integrity testing and pile load tests.
Pier construction using climbing formwork, pier cap with corbel design for pre-cast segment bearings.
Match-cast segmental box girders in casting yard with steam curing, geometric control, and epoxy joint preparation.
Launching gantry operation — segment-by-segment erection, pre-stressing with multi-strand jacks, and geometry check.
Ballastless track slab, rail installation, OHE (overhead electrification), signaling, and telecom systems.
System integration testing, speed trials, safety certification by CMRS, and operational readiness assessment.
What sets us apart from other contractors in this domain.
Active contributor to India's Bullet Train (MAHSR) project
Pre-cast segmental viaduct construction expertise
International-standard quality management (Japanese QA protocols)
Specialized workforce trained in high-precision rail construction
Pan-India Presence
VRSIPL delivers high-speed rail & metro across 6+ states — from Gujarat and Rajasthan to Madhya Pradesh, Maharashtra, and beyond. Wherever your project is, our teams are ready to mobilise.
Common questions about our high-speed rail & metro capabilities, certifications, and project experience.
Yes, VRSIPL is a qualified contractor for Railway Vikas Nigam Limited (RVNL) and National High Speed Rail Corporation (NHSRCL) projects, including elevated viaduct construction, pier and foundation works, and metro station civil works.
VRSIPL uses pre-cast segmental box girder construction with match-cast methodology and launching gantry erection, ensuring millimetre-level geometry accuracy required for high-speed rail and metro rail corridors.
VRSIPL has contributed to metro rail and elevated rail corridor projects in Ahmedabad, Surat, and other Indian cities, delivering 200+ km of rail infrastructure across 5+ cities as a sub-contractor and main contractor.
VRSIPL constructs large-diameter bored piles (1.2m-2.0m dia, 30m+ depth), well foundations, and pile caps as substructures for metro piers, with sonic integrity testing and pile load tests as per RDSO/client specifications.
Yes, VRSIPL establishes pre-cast segment casting yards with match-cast methodology, steam curing chambers, geometric control (total station surveys), epoxy joint preparation, and QA inspection — ensuring zero geometry error in the erected viaduct.
VRSIPL has experience across conventional rail (90-160 km/h), metro rail (80-120 km/h), and high-speed rail (350 km/h corridor) civil works — adapting construction methodology to the stringent geometry tolerances of each speed regime.
In-depth technical guides from our EPC specialists.

Indian Railways is adding 5,000+ km of new track annually. Railway construction is fundamentally different from highway …
Read Guide
India has 27 cities with approved or operational metro rail systems — the world's largest metro construction programme. …
Read GuideLet our experienced team help you plan, design, and execute your next project. Contact us today for a consultation.