Completed Projects

We design, build and maintain the quality of the projects for clients worldwide. We make your Work stand out. Interested? Let's chat.

Bridge Project

 

Sr no.Name of The WorkCost Rs. in LacsTitle
1.Construction of Obedullaganj R.O.B. at Railway X-ing no. 240 of Itarsi Bhopal section On Bhopal- Obedullaganj- Rehti Road. Distt.-Raisen.3304.77ROB Project Obedullaganj
2.Construction of R.C.C. Retaining wall around Bhairav hillock on Mandhata Island at Omkareshwar including necessary survey and design as per drawing and specifications.1290.00Retaining Wall Project
3.Construction of High Level Bridge over Bawna River at Km 115/8 on NH 86 Extn. Bhopal-Sanchi -Sagar.537.527Bawana River Bridge
4.Construction of High level Bridge from new jhulapul near bhairav Gupha at Omkareshwar Distt. Khandwa.478.43Bridge Omkareshwar

 

Building Project

 

Sr no.Name of The WorkCost Rs. in LacsTitle
1.Construction of Kanya Shiksha Parisar at Hoshangabad.2866.95School Building Hoshangabad
2.Construction of 30 baded New Ward and New O.P.D. Block and F Type Quarter i/c Electrification at amudayik Swasthya Kendra Seoni Malwa Distt. Hoshangabad.895.43Hospital Building Seoni-Malwa
3.Providing 30 Units Type – II, Quarters at Bharuch in connection with providing 100 Units Type-II, Quarters on Replacement account in lieu of Old Sub- Standard Quarters on BRC Division.491.1Residential Building Bharuch
4.Demolition of Old School Building and at The same place construction of new school building of primary school no. 45 & 46 at khatodara in South Zone (Udhna), Surat.234.01School Building Surat

 

Industrial & Infrastructure Project

 

Sr no.Name of The WorkCost Rs. in LacsTitle
1.Construction of RCC SWD at Dahej (Part – I).9409.39GIDC Dahej Part-1
2.Infrastructure Development Works of BT Road, Storm Water Drains, Water Works, 33kv and 11kv Line Laying and 33/11kv Sub-station Street lights etc. at Kiratpur Industrial Area Kiratpur village Hoshangabad District Madhya Pradesh.2698.35Kiratpur Industrial Area
3.Construction of Intake at Narmada River, laying of raw water transmission main, RCC ESR, Sump and construction of Water Treatment Plant at Mohasa Babai industrial area, Babai village, Hoshangabad District, Madhya Pradesh.2319.58Babai Industrial Area
4.The Work of Constructing foundation of Windmills, Casting of Windmill foundation at our 51.2MW Windmill Farm Projects near by at Village: Bairu, Indroka, Salodi, Badi, Bada katecha, Malunga, Chainsing nagar, Balwara, Digdi at Jodhpur.998.86Wind Mill Foundation
5.The Work of Constructing foundation of Windmills, Approach roads & Platforms at Samana Site, Taluka Jamjodhpur Dist. Jamnagar, Gujarat.874.00Wind Mill Foundation

 

Irrigation Project

 

Sr no.Name of the WorkCost Rs. in LacsTitle
1.Omkareshwar Project Main Canal, system, Phase – III – Right bank flow Canal between RD KM 85 to RD KM 162.950.13110.00Omkareshwar Main Canal
2.Cement Concrete Lining with Paver Machine from CH.214 to CH.1526 of LEFT BANK MAIN CANAL under TAWA Project ITARSI M.P.10183.46Tawa Main Canal
3.Restructuring and modernisation of Medki Branch Canal from Ch. 0 to 1181, Waraseoni Branch Canal from Ch. 0 to Ch. 330 along with Beni, Thanegaon and Navegaon Disty of District Balaghat.5855.21Medki Branch Canal
4.Construction of Panchamnagar Barrage on near Niwari Village, Tehsil Banda, Dist. Sagar (M.P.).5361.68Panchamnagar Dam
5.Improvement to K. R. B. M. C. Ch. 16354 to 30750 M Tal:- Mandvi; Dist:- Surat. (Package- 4 & 5).4263.80Kakrapar Main Canal (Package – 4 & 5)
6.Construction Of Balance Work Of Spill Way, Drilling And Grouting, Tower Type Head Sluice, Earth Work Of Bund, Pitching, Boulder Toe Etc., Excavation Of Spill And Approach Channel of Bilgaon Medium Project Distt. Dindori.4190.96Bilgaon Dam
7.Construction of Major Structure of Upper Tilwara Canal (1) Syphonic Aqueduct from R.D.4080.00m to 7860.00 m. at Wainganga river & open trough at chanta Nalla near village Kuddo from R.D. 21600.00 m. to 22170.00 m. including all Hydraulic, Geological investigation, design, drawing as per Topographical requirement, this work also includes Finalization of detailed Alignment by survey of Upper Tilwara Canal on TURNKEY BASIS.3312.08Upper Tilwara Canal Aqueduct
8.Restoration and Lining work in Canal of Upari Kararwar Weir secheme under Palamu District.2958.07Upari Canal Project
9.Renovation And Special Repairs of Shedhi Branch Canal & Structure between CH.46.03 to 66.79 km. (Package -7).2601.25Shedhi Branch Canal
10.Constructing earthwork, Lining, Service Road, Bridges and Drainage syphones (Hydraulic structure) for Narmada Main Canal reach Ch. 388.164 to 395 km NMC (Slice- 12A).2351.84Narmada Main Canal
11.Construction of Jambhira Earth Dam from truncated to ultimate height from RD 2830M to 3930 M ( Reach-l ).2214.65Jambhira Dam Project
12.Constructing Earthwork, Lining, Structures & Service road including maintenance repair work (for five (5) years) for Distributary D-3 and its minors of Morbi Branch canal from ch.8.00 to 14.00 km (package –II).2028.89Morbi Branch Canal (Package-II)
13.Constructing Earthwork, Lining & Structures of Maliya Branch canal (Slice-V).2012.03Maliya Branch Canal (Slice-V)
14.Constructing Earthwork, Structures, and Lining to Viramgam Branch Canal –II (O to 39 Km).1900.60Viramgam Branch Canal
15.Cement Concrete Lining to Betnoti Branch Canal from RD. 00m to 9000m with inspection Road.1822.33Betnoti Branch Canal
16.Constructing Earthwork, Lining and Structures including operation and maintenance & Security of Chauthanesda Distributary and its minors off taking at ch.11716 M. of Dhima Branch Canal ex ch.440.06 km of Narmada Main Canal (Package-IV).1818.65Dhima Branch Canal (Package-IV)
17.Constructing earthwork, Lining service road and canal / Syphon/ cross Regulator (Hydraulic Structures) for Limbdi Bhogavo River of Limbdi sub Branch canal ch. 29.910 to 31.090 km.1111.20Limdi Sub Branch Canal
18.Constructing Earthwork, C.C.Lining, Structures and services Road of the distributory and minors of Bajarda distributory (D-15) offtaking from ch. 50.856 km. of Vallabhipur Branch Canal (Package-13).833.09Vallabhipur Branch Canal (Package-13)
19.Construction of 8 Big River Checkdams near village Akri, Thumbdi & Pakho in Abdasa Taluka, District. Kachchh. (Package No. KICD-6&7/2012-13) under 13th Finanace Commission (Burkhan-1-2-3-4, Akri-1, Akri-2, Thumbdi and Pakho-1 Checkdams).544.72Akri Dam Project
20.The work of supplying, laying, jointing, testing and commissioning of underground pipe line for Simej distributary (ch. 0 to 1765m) & Simej minors-I & III of Block no. 14 of Dholka Branch Canal with ancillary work with operation & maintenance for period of five years.365.98Dholka Branch Canal
21.Construction of Spreading Channel (Radial Canal) Joining Bhogat Bandhara – Medha Creek TR in Kalyanpur Taluka of Jamnagar District.126.79Radial Canal

 

Road Project

 

Sr no.Name of the WorkCost Rs. in LacsTitle
1.Widening and Reconstruction of Rampayali -Garra Chouki Road (MP-SH-42-16) Khairlanji- Agasi Road (MP-MDR-42-18) Laalbarra-Samnapur Road(MP-SH-42-20) Sitapathar-Mahkepaar-Goreghat Road (MP-DR-42-24) Package No : 12.20797.70Rigid Pavement
2.Widening and Reconstruction of Hathnapur Anwalighat Salkanpur (MDR-30-19), Tawa Bridge Itarasi Mandi (MDR-30-06) & Itarasi Dulariya Tigariya (MDR-30-04) Package No : R.11210.57Flexible Pavement
3.Rehabilitation and up-gradation of Katni – Umaria Section of NH-78 from km. 0/000 to km 7/950 (Katni Bypass) and from km 4/600 to km 68/4 (Package – I) to two lane with paved shoulder with provision of rigid pavement in the state of Madhya Pradesh on Engineering Procurement and Construction (EPC) mode.10111.00Rigid Pavement
4.Development of Seoni – Katangi road to Maharashtra border (SH-54) from existing km. 1/5 on SH-26 to km. 51/4 on Seoni-Katangi road and from km. 0/10 to km. 24/10 on Katangi-Bonkatta road and addition of Katnagi town portion (4.915 km) (Design length 78.345 km.) to two lane with hard shoulder under Engineering, Procurement & Construction (EPC) mode in the State of Madhya Pradesh.9687.11Flexible Pavement
5.Upgradation of Gotegaon Bagaspur Jhoteshwar Kunda Road, length 21.38 km.4435.36Rigid Pavement
6.Construction & Maintenance of Rural Roads Under the PRADHAN MANTRI GRAM SADAK YOJANA – Roads under Package: Khargapur Kudila Road to Pacher: 35.00km and Tikamgarh Chhatarpur Road to Imlana: 0.87km.2026.00Flexible Pavement
7.Construction of Jeeraveh Chowki -gawan Bhaironpur to Nipaniya road.1034.02Flexible Pavement
8.Construction of Nipaniya Khatkad Jhaklay Chatarkheda to Seoni Malwa road.902.17Flexible Pavement

 

Water supply & Drainage project

 

Sr no.Name of the WorkCost Rs. in LacsTitle
1.Working survey, soil investigation, Design & Construction of canal offtake structure with stilling chamber, Raw water Reservoir, Raw water intake well and Diversion chamber and Water Treatment Plant, Providing, Supplying and Erecting Pumping Machinery, Design & Construction of Various Sizes RCC ESR/Sumps at Head Works, Providing, Supplying, MS/DI/GI/HDPE pipes & Lowering Laying and Jointing MS/DI/GI/HDPE Pipeline, Head works development For Augmentation of Waghodia Regional Water Supply Scheme.4179.30Wagodiya Water Supply Package-4
2.Kakrapar Regional Water Supply Scheme (D Package), based on Kakrapar weir for villages.3848.56Kakrapar Water Supply Package -D
3.Detailed survey, designing and drawing, Construction of R.C.C. Intake Well cum Pump House, R.C.C. Gangway 50 M long and 3.00 M wide, 4.50 MLD capacity Conventional Water Treatment Plant, RCC Elevated Service Reservoir- (i) 5.00 Lakh Litre capacity with 18 M Staging (Zone – 1), (ii) 2.30 Lakh Litre capacity with 12M Staging (Zone – 2), (iii) 2.20 Lakh Litre capacity with 16 M Staging (Zone-3), UGR – 4.00 lakh capacity, Staff Quarter, Compound wall, Approach road, N.H. Crossing, Railway Crossing, Supplying and laying Raw and Clear Water rising main and Distribution Network, House Connection, Supplying and Installation of VT and Centrifugal pump motor and five years operation & maintenance with allied works etc.2961.71Ramgarh Water Supply
4.Designing and constructing RCC U/G Sump, Filter Plant, Pump House and various type of Pipeline and other ancillary works including O & M for Five years after completion of the works of Narmadabara Regional Water Supply Scheme Package II (Based on Narmada river ) Taluka: Bharuch, District: Bharuch.2884.14Narmadabara Water Supply
5.Design, Construction, Commissioning & performance of Intake well 6.00 m dia. & 25.00 m high with Raw water pump house and approach bridge. The work shall include Supply, Installation & Commissioning of Raw water & Clear water Pumps with necessary substation. Providing Laying, jointing & Commissioning of DI K-9/DI K-7 class Pipe for Raw/Clear water pumping/Feeder main. Construction of Treatment Plant clear water sump well and Clear water pump house and overhead tanks & distribution network and House service connection and HT Feeder complete.2381.85Gadarwada Water Supply
6.Design & Construction for work of Sewer Collecting System, Rising Main, Constructing of Pumping Station, Pumping Machinery, STP, House Connection and Control Panel Room and O & M of 2 Years for Jafrabad Town Under Ground Drainage Project, Dist: Amreli.2129.55Jafrabad Drainage Project
7.Tapi bulk line based South Vyara RWSS District: Tapi.1832.87South Vyara Water Supply
8.Providing, Designing, Construction, Lowering, Laying, Jointing & Commissioning of DI – K9 pipeline & Design, Supply, Installation, Testing and Commissioning of Water Treatment plant & Under Ground Sump including mechanical and electrical work with all allied works including post completion O & M for (05) Five Year Abdasa group water supply scheme based on Narmada Pipeline, Package-II (Mothala WTP), Taluka – Abdasa, District: Kutch.1832.22Abdasa Water Supply
9.Designing & Construction of Intake well; two Check Dams & Strengthening of one Existing Dam, Construction of Asphalt Road project for Ahwa Water Supply Scheme Phase – II, Ta :- Ahwa, Dist :- Dangs1513.87Ahwa Water Supply
10.Providing, Lowering, Laying & Jointing Sewer Collecting System With allied works, bypass/Final Disposal line & Transmission Main From Sub/Main Pumping Station to Respective Nodes/ Zones/ Sewage Treatment Plant Savarkundla Drainage Project.1504.88Savarkundla Drainage Project
11.NZBT water Supply Scheme Const. ESR, U/G Sump, pump house and pipeline at Jambusar1437.50NZBT Water Supply
12.Raw water gravity main, Remodeling of existing pond, Designing & constructing intake well at pond, Raw & pure water rising main, Designing, constructing & commissioning of 212 m3/hr. WTP, 12.50 lacs lits. cap. RCC U/G Sump, 6.50 lacs lits. cap. x 22.00 mt. ht. RCC ESR at H.W., RCC U/G Sump of various cap. at different villages, Pump house, Providing, supplying & laying AC/PVC/DI distribution pipe line, Operator room, Providing, erecting and commissioning Pumping machinery.1287.21SZBT Water supply
13.Sewer collecting system with House connection, Rising main, Designing and construction of pumping station, designing and installation of pumping machinery and O & M for 2 years for Vavdi Underground Drainage project.1168.47Vavdi Drainage Project
14.Designing, Constructing and commissioning of 17 MLD WTP, RCC ESRs of 5 & 2.5 Lacs Lts, RCC U/G Sumps of 20 lacs to 20000 liter at various places, Providing, lowering & laying 400–300 mm dia, DI K-7, pipes-8000 mts, HDPE & PVC pipes, 355 to 90 mm dia-32 Kms, Construction of 2 Nos.-Pump House of size 5×4 mtr including operation & maintenance of the scheme for 60 months under Gadkhol-Dadhal Regional Water Supply Scheme, based on GNFC Existing pond at Village Gadkhol.1102.38Gadkhol-Dadhall Water Supply
15.Survey, Design, Construction & Commissioning of Intake well with Raw water pump house and approach bridge including Supply, Installation & Commissioning of Raw water & Clear water Pumps with necessary electromechanical works. Providing Laying, jointing & Commissioning of DI K-9/DI K-7 class Pipe for Raw/Clear water pumping/Feeder main. Construction of Water Treatment Plant of capacity 7.30 MLD clear water sump well and Clear water pump house and one 1000 KL overhead tank & distribution network of 43157 Meter and House service Connections, Transformer etc.1092.83Manawar Water Supply
16.Design, Construction, Commissioning & performance of Intake well 5.00 m dia. & 28.00 m high with Raw water pump house and approach bridge. The work shall include Supply, Installation & Commissioning of Raw water & Clear water Pumps with necessary substation. Providing Laying, jointing & Commissioning of DI K-9/DI K-7 class Pipe for Raw/Clear water pumping/Feeder main. Construction of Treatment Plant clear water sump well and Clear water pump house and overhead tanks, road restoration, HT Feeder, distribution network and House service connection.1089.36Anjad Water Supply
17.Rising Main, Gravity Main & Distribution pipe line network including RCC, ESR, Sump, pump House and Pumping Machinery for Savarkundla Water supply Scheme under the UIDSSMT.1043.35Savarkundla Water supply
18.The works for CZBT Regional Water Supply Scheme – Part – I – Karela Section & The works for CZBT Regional Water Supply Scheme – Part – II – Vilayat Section.977.31CZBT Water Supply
19.Providing, Supplying, Lowering, Laying Sewer Collecting System with allied work, house connection, compound wall and wire fencing; including post completion O & M for 24 months for Rapar Under Ground Drainage Project, Taluka Rapar Dist. Kutch.778.60Rapar Drainage Project
20.Under Ground drainage work of Village Malia Hatina, Dist- Junagadh.588.11Malia Hatina Drainage Project
21.Lowering, Laying Of 300mm To 900mm K-9 Class Dia Sewerage Rising Pipeline For Sewege Pumping Station A, B, C, D & E To Sewage Treatment Plant At Gavier For New South West Drainage Zone Under NRCP. (Package: 1).565.46SMC Drainage Project
22.Providing , Laying, Jointing of 100 mm to 500 mm dia DWC-HDPE class SN 8 sewer in a length of 41485 m along with HDPE and Brick masonry manholes, Construction of RCC Sump, Providing and installation of non clog sewage submersible motor pumps along with panels and required pipes and accessories, Providing & erection of electrical substation along with required accessories, Providing and erection of generator set on hire, Laying, jointing of 200mm dia DI class K-9 pumping main including all works pertaining to successful completion of proposal, testing, commissioning, trial run and operation and maintenance upto June 2016 and dismantling of whole system after mela period for Simhastha 2016 at Ujjain UJADKHEDA_CHINTAMAN_DATT AKHADA “B” ZONE.480.38Simhastha 2016 Ujjain Drainage Project
23.Providing , Laying, Jointing of 100 mm to 500 mm dia DWC-HDPE class SN 8 sewer in a length of 20060 m along with HDPE and Brick masonry manholes, Construction of RCC Sump, Providing and installation of non clog sewage submersible motor pumps along with panels and required pipes and accessories, Providing & erection of electrical substation along with required accessories, Providing and erection of generator set on hire, Laying, jointing of 500mm dia DI class K-9 pumping main including all works pertaining to successful completion of proposal, testing, commissioning, trial run and operation and maintenance upto June 2016 and dismantling of whole system after mela period for Simhastha 2016 at Ujjain. INDIRA NAGAR_MANGALNATH” C” ZONE.479.57Simhastha 2016 Ujjain Drainage Project
24.Providing , Laying, Jointing of 100 mm to 500 mm dia DWC-HDPE class SN 8 sewer in a length of 37116 m along with HDPE and Brick masonry manholes, Construction of RCC Sump, Providing and installation of non-clog sewage submersible motor pumps along with panels and required pipes and accessories, Providing & erection of 11/0.433 KV, electrical substation along with required accessories, Providing and erection of generator set on hire, Laying, jointing of 300mm dia DI class K-9 pumping main including all works pertaining to successful completion of proposal, testing, commissioning, trial run and operation and maintenance upto June 2016 and dismantling of whole system after mela period for Simhastha 2016 at Ujjain. ANKPAT_MANGALNATH “A” ZONE.469.44Simhastha 2016 Ujjain Drainage Project

 

Clientele